Difference between revisions of "Andre log"

From RAWiki
Jump to: navigation, search
(Monday September 8, 2015)
(Monday September 8, 2015)
Line 5: Line 5:
 
#worked on improvement to tether system for goats
 
#worked on improvement to tether system for goats
 
# fixed  the cable
 
# fixed  the cable
 +
#frozen meat inventory
  
 
==Sept 1, 2015==
 
==Sept 1, 2015==

Revision as of 12:04, 7 September 2015

Monday September 8, 2015

  1. Pantry restock
  2. Seated bearing for swather
  3. worked on improvement to tether system for goats
  4. fixed the cable
  5. frozen meat inventory

Sept 1, 2015

  1. Facebook posting about sausage fest
  2. Set up calf pen
  3. Run ditchwater
  4. Orient Bertram on tank setup, drain and rotate tanks