Difference between revisions of "JacobSpringsFarm:Silo house"
From RAWiki
(→Materials that we already have) |
(→Materials that we already have) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
==Materials that we already have== | ==Materials that we already have== | ||
− | 2 ea 12' long steel angles for door frames. | + | *2 ea 12' long steel angles for door frames. |
− | + | ||
− | + | *12 ea 3" x 10 3/4" Doug fir beams 8'+ | |
− | + | *4 ea vertical posts (cut in half 2 of the 3"x10 3/4" beams) | |
− | Top plate plywood pieces for top ring of silo. | + | *Hardwood oak flooring: estimated 600+ sq ft |
+ | |||
+ | *Top plate plywood pieces for top ring of silo. | ||
+ | |||
+ | *"Slate" roofing shingles | ||
+ | |||
+ | ==Materials we still need== | ||
+ | |||
+ | *Concrete and rebar for the piers and the bottom ring | ||
+ | **How much rebar? | ||
+ | **How much concrete? | ||
+ | **anchors & epoxy to tie into existing concrete | ||
+ | *Concrete pier blocks for bottom floor |
Latest revision as of 13:22, 14 October 2015
Materials that we already have
- 2 ea 12' long steel angles for door frames.
- 12 ea 3" x 10 3/4" Doug fir beams 8'+
- 4 ea vertical posts (cut in half 2 of the 3"x10 3/4" beams)
- Hardwood oak flooring: estimated 600+ sq ft
- Top plate plywood pieces for top ring of silo.
- "Slate" roofing shingles
Materials we still need
- Concrete and rebar for the piers and the bottom ring
- How much rebar?
- How much concrete?
- anchors & epoxy to tie into existing concrete
- Concrete pier blocks for bottom floor