==Materials we still need==
 +
 +
*Concrete and rebar for the piers and the bottom ring
 +
**How much rebar?
 +
**How much concrete?
 +
**anchors & epoxy to tie into existing concrete
 +
*Concrete pier blocks for bottom floor

Latest revision as of 13:22, 14 October 2015

Materials that we already have

  • 2 ea 12' long steel angles for door frames.
  • 12 ea 3" x 10 3/4" Doug fir beams 8'+
  • 4 ea vertical posts (cut in half 2 of the 3"x10 3/4" beams)
  • Hardwood oak flooring: estimated 600+ sq ft
  • Top plate plywood pieces for top ring of silo.
  • "Slate" roofing shingles

Materials we still need

  • Concrete and rebar for the piers and the bottom ring
    • How much rebar?
    • How much concrete?
    • anchors & epoxy to tie into existing concrete
  • Concrete pier blocks for bottom floor