Difference between revisions of "JacobSpringsFarm:To do lists"
From RAWiki
(→Justin to do list) |
(→Austin to do list) |
||
Line 28: | Line 28: | ||
# finish siding in the farm kitchen pantry | # finish siding in the farm kitchen pantry | ||
# galvanized steel interior to farm kitchen bathroom | # galvanized steel interior to farm kitchen bathroom | ||
− | # install gutter on barn roof | + | # <s>install gutter on barn roof</s> |
# install gutter on shop roof | # install gutter on shop roof | ||
# pressure washer install | # pressure washer install | ||
# create housing for milking vacuum pump | # create housing for milking vacuum pump | ||
− | # | + | # <s> make wood rack</s> |
==Justin to do list== | ==Justin to do list== |
Revision as of 11:57, 7 April 2015
Contents
General Jacob Springs Farm to do list
- Insulate chick room - prep chick room for chicks starting March 18
make plan for workday monday Feb 16, 2015- Wood chips:
- dump into pig pens
- dump on road and spread
- dump on pear tree and herb area
move fence parts to west end of field.-
sorting wood by pig pens shovel out chicken room in barn- shovel out chicken house
- rake out hay from cow winter area
greenhouse organize.- silo area organize
- scrape and paint house trim
- finish pig pens
-
finish divider panels -
build gate panels - rebuild panels that sow wrecked
-
Austin to do list
-
replace windows in chick room -
put egg sign back up -
new windows in barn - barn roof wet patch (again :( )
- bat problems (ask Vanee)
- re-point chimney morter
- finish siding in the farm kitchen pantry
- galvanized steel interior to farm kitchen bathroom
-
install gutter on barn roof - install gutter on shop roof
- pressure washer install
- create housing for milking vacuum pump
-
make wood rack
Justin to do list
- change oil: big truck, tractor,
- Insulate barn - chick room
-
insulate farm kitchen - put up cabinets and interior siding outside kitchen.
- install gutter on barn roof
- install gutter on shop roof
MEASUREMENTS FOR ROOFING SUPPORTS Chick Room: Quantity: 7 Length 12ft Main Barn: Quantity: 17 Length: 12ft
Justin hours
Hours done: Feb:5 Mar:3,4 Hours needed: Feb 15 Mar:17
Ethan to do
- Clean up shop (scrap and materials out)
- Take in starter for forklift
- Cut down and install racks in farm kitchen
Danny to do list
- henmulator troubleshoot
- Roosts in hen house
- boxes in hen house
Andre to do list
-
pick up egg mobile from Marsha's - pick up baler from Friar Farm
- plow for walking onions
- plow for garlic
- till and rototill for cabbage, leeks, onions etc...
- make latch system for barn door