Difference between revisions of "JacobSpringsFarm:To do lists"

From RAWiki
Jump to: navigation, search
(In house to do list)
Line 32: Line 32:
 
#Pond keyway for dam
 
#Pond keyway for dam
  
==Austin to do list==
+
 
 +
==Danny to do list==
 +
# henmulator troubleshoot
 +
# Roosts in hen house
 +
# boxes in hen house
 +
 
 +
==Andre to do list==
 +
# <s>pick up egg mobile from Marsha's</s>
 +
#<s> pick up baler from Friar Farm </s>
 +
# <s> plow for walking onions</s>
 +
# plow for garlic
 +
# till and rototill for cabbage, leeks, onions etc...
 +
# make latch system for barn door
 +
# <s> build sliding door to milk room</s>
 +
 
 +
==<s>Austin to do list</s>==
 
# <s>replace windows in chick room</s>
 
# <s>replace windows in chick room</s>
 
# <s> put egg sign back up</s>
 
# <s> put egg sign back up</s>
Line 73: Line 88:
 
# repoint chimneys on house
 
# repoint chimneys on house
 
# prep 2x4s for barn rafters
 
# prep 2x4s for barn rafters
 
==Danny to do list==
 
# henmulator troubleshoot
 
# Roosts in hen house
 
# boxes in hen house
 
 
==Andre to do list==
 
# <s>pick up egg mobile from Marsha's</s>
 
#<s> pick up baler from Friar Farm </s>
 
# <s> plow for walking onions</s>
 
# plow for garlic
 
# till and rototill for cabbage, leeks, onions etc...
 
# make latch system for barn door
 
# <s> build sliding door to milk room</s>
 

Revision as of 10:01, 5 October 2015

General Jacob Springs Farm to do list

  1. Insulate chick room - prep chick room for chicks starting March 18
  2. make plan for workday monday Feb 16, 2015
  3. Wood chips:
    1. dump into pig pens
    2. dump on road and spread
    3. dump on pear tree and herb area
  4. move fence parts to west end of field.
  5. sorting wood by pig pens
  6. shovel out chicken room in barn
  7. shovel out chicken house
  8. rake out hay from cow winter area
  9. greenhouse organize.
  10. silo area organize
  11. scrape and paint house trim
  12. finish pig pens
    1. finish divider panels
    2. build gate panels
    3. rebuild panels that sow wrecked

In house to do list

  1. Vanee: complete list
  2. Andre's shelf in Master bedroom

Mini backhoe to do list

  1. Farm kitchen tank
  2. new outhouse pit
  3. culvert at silo pen
  4. culvert at front entrance
  5. natural swimming pool
  6. Pond keyway for dam


Danny to do list

  1. henmulator troubleshoot
  2. Roosts in hen house
  3. boxes in hen house

Andre to do list

  1. pick up egg mobile from Marsha's
  2. pick up baler from Friar Farm
  3. plow for walking onions
  4. plow for garlic
  5. till and rototill for cabbage, leeks, onions etc...
  6. make latch system for barn door
  7. build sliding door to milk room

Austin to do list

  1. replace windows in chick room
  2. put egg sign back up
  3. new windows in barn
  4. barn roof wet patch (again :( )
  5. bat problems (ask Vanee)
  6. re-point chimney morter
  7. finish siding in the farm kitchen pantry
  8. galvanized steel interior to farm kitchen bathroom
  9. install gutter on barn roof
  10. install gutter on shop roof
  11. pressure washer install
  12. create housing for milking vacuum pump
  13. make wood rack

Justin to do list

  1. silo area organize
  2. Insulate barn - chick room
  3. insulate farm kitchen
  4. put up cabinets and interior siding outside kitchen.

MEASUREMENTS FOR ROOFING SUPPORTS Chick Room: Quantity: 7 Length 12ft Main Barn: Quantity: 17 Length: 12ft


Justin hours

Hours done: Feb:5 Mar:3,4 Hours needed: Feb 15 Mar:17

Ethan to do

  1. Clean up shop (scrap and materials out)
  2. Take in starter for forklift
  3. Cut down and install racks in farm kitchen
  4. run electric wire through pig pen to pasture
  5. repoint chimneys on house
  6. prep 2x4s for barn rafters