Difference between revisions of "JacobSpringsFarm:To do lists"

From RAWiki
Jump to: navigation, search
(Austin to do list)
Line 23: Line 23:
 
# barn roof wet patch
 
# barn roof wet patch
 
# bat problems (ask Vanee)
 
# bat problems (ask Vanee)
# barn roof wet patch
 
 
# re-point chimney morter
 
# re-point chimney morter
 
# finish siding in the farm kitchen pantry
 
# finish siding in the farm kitchen pantry

Revision as of 10:12, 18 February 2015

General Jacob Springs Farm to do list

  1. make plan for workday monday Feb 16, 2015
  2. Wood chips:
    1. dump into pig pens
    2. dump on road and spread
    3. dump on pear tree and herb area
  3. move fence parts to west end of field.
  4. sorting wood by pig pens
  5. shovel out chicken room in barn
  6. shovel out chicken house
  7. rake out hay from cow winter area
  8. greenhouse organize.
  9. silo area organize
  10. scrape and paint house trim
  11. finish pig pens
    1. finish divider panels
    2. build gate panels
    3. rebuild panels that sow wrecked

Austin to do list

  1. replace windows in chick room
  2. put egg sign back up
  3. barn roof wet patch
  4. bat problems (ask Vanee)
  5. re-point chimney morter
  6. finish siding in the farm kitchen pantry
  7. galvanized steel interior to farm kitchen bathroom
  8. install gutter on barn roof
  9. install gutter on shop roof
  10. pressure washer install
  11. create housing for milking vacuum pump

Justin to do list

  1. Insulate barn - chick room
  2. insulate farm kitchen
  3. put up cabinets and interior siding outside kitchen.
  4. install gutter on barn roof
  5. install gutter on shop roof

Justin hours

Hours done: Feb:5 Hours needed: Feb 15

Danny to do list

  1. Roosts in hen house
  2. boxes in hen house

Andre to do list

  1. pick up egg mobile from Marsha's
  2. pick up baler from Friar Farm
  3. plow for walking onions
  4. plow for garlic
  5. till and rototill for cabbage, leeks, onions etc...
  6. make latch system for barn door