Difference between revisions of "JacobSpringsFarm:To do lists"
From RAWiki
(→Andre to do list) |
(→Justin to do list) |
||
Line 33: | Line 33: | ||
==Justin to do list== | ==Justin to do list== | ||
+ | # change oil: big truck, tractor, | ||
# Insulate barn - chick room | # Insulate barn - chick room | ||
# insulate farm kitchen | # insulate farm kitchen |
Revision as of 20:40, 19 February 2015
Contents
General Jacob Springs Farm to do list
- make plan for workday monday Feb 16, 2015
- Wood chips:
- dump into pig pens
- dump on road and spread
- dump on pear tree and herb area
- move fence parts to west end of field.
- sorting wood by pig pens
- shovel out chicken room in barn
- shovel out chicken house
- rake out hay from cow winter area
- greenhouse organize.
- silo area organize
- scrape and paint house trim
- finish pig pens
-
finish divider panels -
build gate panels - rebuild panels that sow wrecked
-
Austin to do list
-
replace windows in chick room -
put egg sign back up - barn roof wet patch
- bat problems (ask Vanee)
- re-point chimney morter
- finish siding in the farm kitchen pantry
- galvanized steel interior to farm kitchen bathroom
- install gutter on barn roof
- install gutter on shop roof
- pressure washer install
- create housing for milking vacuum pump
Justin to do list
- change oil: big truck, tractor,
- Insulate barn - chick room
- insulate farm kitchen
- put up cabinets and interior siding outside kitchen.
- install gutter on barn roof
- install gutter on shop roof
Justin hours
Hours done: Feb:5 Hours needed: Feb 15
Danny to do list
- Roosts in hen house
- boxes in hen house
Andre to do list
# pick up egg mobile from Marsha's
- pick up baler from Friar Farm
- plow for walking onions
- plow for garlic
- till and rototill for cabbage, leeks, onions etc...
- make latch system for barn door