Difference between revisions of "JacobSpringsFarm:To do lists"

From RAWiki
Jump to: navigation, search
(In house to do list)
Line 20: Line 20:
  
 
==In house to do list==
 
==In house to do list==
#Vanee: complete list
+
#Attach boys headboard to bed frame
 +
#make it so bats don't live in the house next spring
 
#Andre's shelf in Master bedroom
 
#Andre's shelf in Master bedroom
 +
#put trim in Danny & Rene's living/dining room
 +
#replace Danny & Rene's window
 +
#finish Danny & Rene's china cabinet
 +
#finish piano/assemble
 +
#finish organizing garage so we can put things away and have others do the same
 +
#put trim at top of stairs and landing
 +
#fix washer in cottage
 +
#fix outlets in M. Bedroom & cover with plates
 +
#finish trim in bathroom
 +
#put up towel rack in bathroom
 +
#trim for edges of stairs in living room?
 +
#finish heaters/drywall in bedroom near Vanee's desk
 +
#dry wall holes in bedroom
 +
#dry wall holes in entryway
 +
#shelves for "office" area
 +
#another shelf in linen closet?
 +
#paint ceiling in kitchen
 +
#repaint kitchen cabinets
 +
#trim on cabinets
 +
#shelves in kitchen under cabinets
 +
#repaint living room
 +
#paint front and back door
 +
#cover over lead paint
 +
#paint outside of house
 +
#repoint morter
 +
#build/install boot racks or boot/shoe solution for back porch
 +
#replace windows or fixtures so we can open windows in boys room
 +
#replace windows or fixtures so we can open bathroom
 +
#replace windows or fixtures so we can open bedroom windows
 +
#put door on south end of upstairs hallway
 +
#make more places to officially hang guns up and away
 +
#put up or fix Vanee's hook in room
 +
#fix Vanee's desk
 +
#fix Vanee's bottom dresser drawer
 +
#fix hole in boys room wall
 +
#sprinklers so that we can water our landscaping plants
 +
#cull Andre's shoes that are downstairs and on the back porch
 +
#sort and hang or sell instruments in basement
 +
#fix broken front porch and hole
 +
#shelves in bedroom by bedside light?
 +
#go through Andre's paperwork from many years
 +
#fix floor in bathroom
 +
#replace toilets or fix tanks/deep clean
 +
#replace sink or fixtures in guest bathroom
  
 
==Mini backhoe to do list==
 
==Mini backhoe to do list==

Revision as of 17:46, 5 October 2015

General Jacob Springs Farm to do list

  1. Insulate chick room - prep chick room for chicks starting March 18
  2. make plan for workday monday Feb 16, 2015
  3. Wood chips:
    1. dump into pig pens
    2. dump on road and spread
    3. dump on pear tree and herb area
  4. move fence parts to west end of field.
  5. sorting wood by pig pens
  6. shovel out chicken room in barn
  7. shovel out chicken house
  8. rake out hay from cow winter area
  9. greenhouse organize.
  10. silo area organize
  11. scrape and paint house trim
  12. finish pig pens
    1. finish divider panels
    2. build gate panels
    3. rebuild panels that sow wrecked

In house to do list

  1. Attach boys headboard to bed frame
  2. make it so bats don't live in the house next spring
  3. Andre's shelf in Master bedroom
  4. put trim in Danny & Rene's living/dining room
  5. replace Danny & Rene's window
  6. finish Danny & Rene's china cabinet
  7. finish piano/assemble
  8. finish organizing garage so we can put things away and have others do the same
  9. put trim at top of stairs and landing
  10. fix washer in cottage
  11. fix outlets in M. Bedroom & cover with plates
  12. finish trim in bathroom
  13. put up towel rack in bathroom
  14. trim for edges of stairs in living room?
  15. finish heaters/drywall in bedroom near Vanee's desk
  16. dry wall holes in bedroom
  17. dry wall holes in entryway
  18. shelves for "office" area
  19. another shelf in linen closet?
  20. paint ceiling in kitchen
  21. repaint kitchen cabinets
  22. trim on cabinets
  23. shelves in kitchen under cabinets
  24. repaint living room
  25. paint front and back door
  26. cover over lead paint
  27. paint outside of house
  28. repoint morter
  29. build/install boot racks or boot/shoe solution for back porch
  30. replace windows or fixtures so we can open windows in boys room
  31. replace windows or fixtures so we can open bathroom
  32. replace windows or fixtures so we can open bedroom windows
  33. put door on south end of upstairs hallway
  34. make more places to officially hang guns up and away
  35. put up or fix Vanee's hook in room
  36. fix Vanee's desk
  37. fix Vanee's bottom dresser drawer
  38. fix hole in boys room wall
  39. sprinklers so that we can water our landscaping plants
  40. cull Andre's shoes that are downstairs and on the back porch
  41. sort and hang or sell instruments in basement
  42. fix broken front porch and hole
  43. shelves in bedroom by bedside light?
  44. go through Andre's paperwork from many years
  45. fix floor in bathroom
  46. replace toilets or fix tanks/deep clean
  47. replace sink or fixtures in guest bathroom

Mini backhoe to do list

  1. Farm kitchen tank
  2. new outhouse pit
  3. culvert at silo pen
  4. culvert at front entrance
  5. natural swimming pool
  6. Pond keyway for dam


Danny to do list

  1. henmulator troubleshoot
  2. Roosts in hen house
  3. boxes in hen house

Andre to do list

  1. pick up egg mobile from Marsha's
  2. pick up baler from Friar Farm
  3. plow for walking onions
  4. plow for garlic
  5. till and rototill for cabbage, leeks, onions etc...
  6. make latch system for barn door
  7. build sliding door to milk room

Austin to do list

  1. replace windows in chick room
  2. put egg sign back up
  3. new windows in barn
  4. barn roof wet patch (again :( )
  5. bat problems (ask Vanee)
  6. re-point chimney morter
  7. finish siding in the farm kitchen pantry
  8. galvanized steel interior to farm kitchen bathroom
  9. install gutter on barn roof
  10. install gutter on shop roof
  11. pressure washer install
  12. create housing for milking vacuum pump
  13. make wood rack

Justin to do list

  1. silo area organize
  2. Insulate barn - chick room
  3. insulate farm kitchen
  4. put up cabinets and interior siding outside kitchen.

MEASUREMENTS FOR ROOFING SUPPORTS Chick Room: Quantity: 7 Length 12ft Main Barn: Quantity: 17 Length: 12ft


Justin hours

Hours done: Feb:5 Mar:3,4 Hours needed: Feb 15 Mar:17

Ethan to do

  1. Clean up shop (scrap and materials out)
  2. Take in starter for forklift
  3. Cut down and install racks in farm kitchen
  4. run electric wire through pig pen to pasture
  5. repoint chimneys on house
  6. prep 2x4s for barn rafters