Difference between revisions of "Sunrise Mesa Infrastructure Tasks"
From RAWiki
(→Immediate Action Items) |
(→Immediate Action Items) |
||
Line 22: | Line 22: | ||
*name, list and map all structures, areas, ponds and pasture | *name, list and map all structures, areas, ponds and pasture | ||
− | *prepare notes for meeting with John and Lisa Marie | + | *prepare notes for meeting with John and Lisa Marie Cranmer |
==Horse Barn (White)== | ==Horse Barn (White)== |
Revision as of 18:39, 24 November 2020
Form a strategy and delegate tasks to team members
- Kate
- Andre
- Richard & Blanka
- Alex
- Dustin
- Define roles and responsibilities for each with goals
- Categorize tasks as Urgent vs Important, create goals and timeline
Contents
Immediate Action Items
- Mask remainder of Mobile Home for painting (Richard & Blanka)
- Renovate Poultry Shed (Dustin) prep for introducing birds
- Paint Two Bedrooms and the Bathroom of the Mobile Home - Zach Chupa
- Connect 220v electrical panel of Tiny house and remove the extension cords
- trench for water
- connect tank
- modify well pump connect using pitiless adapter
- investigate the pressure pump
- name, list and map all structures, areas, ponds and pasture
- prepare notes for meeting with John and Lisa Marie Cranmer
Horse Barn (White)
- Source sheet metal (standing seam)
- Investigate structural members and plan sistering
- Investigate Foundation
Red Barn (Red)
- Investigate foundation and plan new footing
- Investigate structural members and plan sistering
- Create plant for roof
Beekeeping
- assess hives
- treat for mites
- winterize
- secure against bears
Pastures, Fields and Outdoor Areas
- Sunrise Mesa Prairie Dog Plan: create
- Spread Manure, lots
- Map water and plan ditches
- Fencing Plan
- Ponds and Streambed Rebuild