Difference between revisions of "Sunrise Mesa Infrastructure Tasks"

From RAWiki
Jump to: navigation, search
(Immediate Action Items)
(Immediate Action Items)
Line 22: Line 22:
  
 
*name, list and map all structures, areas, ponds and pasture
 
*name, list and map all structures, areas, ponds and pasture
*prepare notes for meeting with John and Lisa Marie
+
*prepare notes for meeting with John and Lisa Marie Cranmer
  
 
==Horse Barn (White)==
 
==Horse Barn (White)==

Revision as of 18:39, 24 November 2020

Form a strategy and delegate tasks to team members

    • Kate
    • Andre
    • Richard & Blanka
    • Alex
    • Dustin
  • Define roles and responsibilities for each with goals
  • Categorize tasks as Urgent vs Important, create goals and timeline

Immediate Action Items

  • Mask remainder of Mobile Home for painting (Richard & Blanka)
  • Renovate Poultry Shed (Dustin) prep for introducing birds
  • Paint Two Bedrooms and the Bathroom of the Mobile Home - Zach Chupa
  • Connect 220v electrical panel of Tiny house and remove the extension cords
  • trench for water
  • connect tank
  • modify well pump connect using pitiless adapter
  • investigate the pressure pump
  • name, list and map all structures, areas, ponds and pasture
  • prepare notes for meeting with John and Lisa Marie Cranmer

Horse Barn (White)

  • Source sheet metal (standing seam)
  • Investigate structural members and plan sistering
  • Investigate Foundation

Red Barn (Red)

  • Investigate foundation and plan new footing
  • Investigate structural members and plan sistering
  • Create plant for roof

Beekeeping

  • assess hives
  • treat for mites
  • winterize
  • secure against bears

Pastures, Fields and Outdoor Areas