Difference between revisions of "Sunrise Mesa to-do list"

From RAWiki
Jump to: navigation, search
(Workday Feb 13, 2021)
 
(4 intermediate revisions by the same user not shown)
Line 8: Line 8:
 
*Structures Team, Leader: Ried Lustig
 
*Structures Team, Leader: Ried Lustig
 
**Lift roof on Loafing Shed
 
**Lift roof on Loafing Shed
**Red Barn South Wall rebuild
+
**Red Barn South Wall Rebuild
 +
***Need: Truck Jacks, Lag Bolts, Screws and driver, 2x6 timbers
  
 
*Water Systems Team Leader: Andre
 
*Water Systems Team Leader: Andre
 
**Well hookup
 
**Well hookup
 
**Toilet in Mobile Home
 
**Toilet in Mobile Home
 
+
**Trench for pipes and tank hookup
 +
**Test electrical in pressure pump
 +
***Need Pluming and electrical tools, fittings and pipe
  
 
*Cleanup Team, Leader:Hadassah
 
*Cleanup Team, Leader:Hadassah
 
**Red Barn
 
**Red Barn
 
**Trees and Shrubs
 
**Trees and Shrubs
 +
***Hands, (gloves?) Saws and loppers
  
 
*Mobile Home Team, Leader: Chelsey
 
*Mobile Home Team, Leader: Chelsey
 
**Paint Kitchen
 
**Paint Kitchen
 
**Clean Kitchen
 
**Clean Kitchen
 +
***Need Paint, cleaning and painting supplies, water
 +
 +
*Food Team: Leader Tulsi
  
 
==General To Do==
 
==General To Do==
Line 32: Line 39:
 
*Renovate [[Sunrise Mesa Poultry Program | Poultry Shed]] (Dustin) prep for introducing birds ([[Pigeons]] and chickens)
 
*Renovate [[Sunrise Mesa Poultry Program | Poultry Shed]] (Dustin) prep for introducing birds ([[Pigeons]] and chickens)
 
**<s>Beef up structure</s>
 
**<s>Beef up structure</s>
**Seal Perimeter
+
**<s>Seal Perimeter</s>
 
**Paint Shed
 
**Paint Shed
 
**Setup interior
 
**Setup interior
Line 40: Line 47:
 
**<s>Repair tiny house water system</s>
 
**<s>Repair tiny house water system</s>
 
*Root Cellar Task List
 
*Root Cellar Task List
<s>**Clean out </s>
+
**<s>Clean out </s>
 
*Water System
 
*Water System
 
**trench for water
 
**trench for water
Line 52: Line 59:
 
**move and sort scrap wood, metal, and tires from front fields
 
**move and sort scrap wood, metal, and tires from front fields
 
**remove unnecessary fencing from front field
 
**remove unnecessary fencing from front field
**tear down front red shed siding
+
**<s>tear down front red shed siding</s>
 
*Property Planning
 
*Property Planning
 
**Name, list and map all structures, areas, ponds and pasture
 
**Name, list and map all structures, areas, ponds and pasture
 
**Create map of "dream scenario" for the property
 
**Create map of "dream scenario" for the property
 
*Prepare notes for meeting with John and Lisa Marie Cranmer
 
*Prepare notes for meeting with John and Lisa Marie Cranmer
 +
 +
People on Jan 2021 Workday:
 +
*Donna and Donny
 +
*Hadassah
 +
*Ried Lustig
 +
*Ried Morgan
 +
*Cori Ducombs
 +
*Alex and Emma
 +
*Andre
 +
*Chelsey
 +
*Michael
 +
*Jason Robrahn
 +
*Zach Chupa
 +
*Dustin
 +
*Blanka and Richard
 +
*Lindsey Foy
 +
*Jordan
 +
*Natalie and Steven Brown
 +
*
 +
 +
 +
*Cassie
 +
*Weston Platter
 +
*Abe Lentner
 +
*Malik Salsberry
 +
*Alysia
 +
*Judy Manz
 +
*Katie Hamilton
 +
Andie Young
 +
*

Latest revision as of 17:43, 2 February 2021

Sunrise Mesa Community Task List

To-Do

Workday Feb 13, 2021

  • Structures Team, Leader: Ried Lustig
    • Lift roof on Loafing Shed
    • Red Barn South Wall Rebuild
      • Need: Truck Jacks, Lag Bolts, Screws and driver, 2x6 timbers
  • Water Systems Team Leader: Andre
    • Well hookup
    • Toilet in Mobile Home
    • Trench for pipes and tank hookup
    • Test electrical in pressure pump
      • Need Pluming and electrical tools, fittings and pipe
  • Cleanup Team, Leader:Hadassah
    • Red Barn
    • Trees and Shrubs
      • Hands, (gloves?) Saws and loppers
  • Mobile Home Team, Leader: Chelsey
    • Paint Kitchen
    • Clean Kitchen
      • Need Paint, cleaning and painting supplies, water
  • Food Team: Leader Tulsi

General To Do

  • Mobile Home
    • Mask remainder of Mobile Home for painting (Richard & Blanka)
    • Paint Two Bedrooms and the Bathroom of the Mobile Home - Zach Chupa
    • Paint Living and dining rooms of the Mobile Home - Zach Chupa
    • Replace broken windows
    • Prep north-side bedroom and bathroom for resident arrival
  • Renovate Poultry Shed (Dustin) prep for introducing birds (Pigeons and chickens)
    • Beef up structure
    • Seal Perimeter
    • Paint Shed
    • Setup interior
  • Tiny House
    • Connect 220v electrical panel of Tiny house and remove the extension cords
    • fix water heater
    • Repair tiny house water system
  • Root Cellar Task List
    • Clean out
  • Water System
    • trench for water
    • connect tank
    • modify well pump connect using pitiless adapter
    • investigate the pressure pump
  • Property Cleanup
    • move and sort scrap wood, metal, and tires from driveway
    • tear down green shed
    • create salvageable wood pile (located in red stables)
    • move and sort scrap wood, metal, and tires from front fields
    • remove unnecessary fencing from front field
    • tear down front red shed siding
  • Property Planning
    • Name, list and map all structures, areas, ponds and pasture
    • Create map of "dream scenario" for the property
  • Prepare notes for meeting with John and Lisa Marie Cranmer

People on Jan 2021 Workday:

  • Donna and Donny
  • Hadassah
  • Ried Lustig
  • Ried Morgan
  • Cori Ducombs
  • Alex and Emma
  • Andre
  • Chelsey
  • Michael
  • Jason Robrahn
  • Zach Chupa
  • Dustin
  • Blanka and Richard
  • Lindsey Foy
  • Jordan
  • Natalie and Steven Brown


  • Cassie
  • Weston Platter
  • Abe Lentner
  • Malik Salsberry
  • Alysia
  • Judy Manz
  • Katie Hamilton

Andie Young