Difference between revisions of "Sunrise Mesa to-do list"
From RAWiki
(→To-Do) |
(→Workday Feb 13, 2021) |
||
Line 14: | Line 14: | ||
**Well hookup | **Well hookup | ||
**Toilet in Mobile Home | **Toilet in Mobile Home | ||
+ | **Trench for pipes and tank hookup | ||
+ | **Test electrical in pressure pump | ||
+ | ***Need Pluming and electrical tools, fittings and pipe | ||
*Cleanup Team, Leader:Hadassah | *Cleanup Team, Leader:Hadassah | ||
**Red Barn | **Red Barn | ||
**Trees and Shrubs | **Trees and Shrubs | ||
+ | ***Hands, (gloves?) Saws and loppers | ||
*Mobile Home Team, Leader: Chelsey | *Mobile Home Team, Leader: Chelsey | ||
**Paint Kitchen | **Paint Kitchen | ||
**Clean Kitchen | **Clean Kitchen | ||
+ | ***Need Paint, cleaning and painting supplies, water | ||
+ | |||
+ | *Food Team: Leader Tulsi | ||
==General To Do== | ==General To Do== |
Revision as of 17:24, 2 February 2021
Sunrise Mesa Community Task List
To-Do
Workday Feb 13, 2021
- Structures Team, Leader: Ried Lustig
- Lift roof on Loafing Shed
- Red Barn South Wall Rebuild
- Need: Truck Jacks, Lag Bolts, Screws and driver, 2x6 timbers
- Water Systems Team Leader: Andre
- Well hookup
- Toilet in Mobile Home
- Trench for pipes and tank hookup
- Test electrical in pressure pump
- Need Pluming and electrical tools, fittings and pipe
- Cleanup Team, Leader:Hadassah
- Red Barn
- Trees and Shrubs
- Hands, (gloves?) Saws and loppers
- Mobile Home Team, Leader: Chelsey
- Paint Kitchen
- Clean Kitchen
- Need Paint, cleaning and painting supplies, water
- Food Team: Leader Tulsi
General To Do
- Mobile Home
Mask remainder of Mobile Home for painting (Richard & Blanka)Paint Two Bedrooms and the Bathroom of the Mobile Home - Zach ChupaPaint Living and dining rooms of the Mobile Home - Zach Chupa- Replace broken windows
- Prep north-side bedroom and bathroom for resident arrival
- Renovate Poultry Shed (Dustin) prep for introducing birds (Pigeons and chickens)
Beef up structure- Seal Perimeter
- Paint Shed
- Setup interior
- Tiny House
Connect 220v electrical panel of Tiny house and remove the extension cordsfix water heaterRepair tiny house water system
- Root Cellar Task List
**Clean out
- Water System
- trench for water
- connect tank
- modify well pump connect using pitiless adapter
- investigate the pressure pump
- Property Cleanup
move and sort scrap wood, metal, and tires from drivewaytear down green shedcreate salvageable wood pile(located in red stables)- move and sort scrap wood, metal, and tires from front fields
- remove unnecessary fencing from front field
- tear down front red shed siding
- Property Planning
- Name, list and map all structures, areas, ponds and pasture
- Create map of "dream scenario" for the property
- Prepare notes for meeting with John and Lisa Marie Cranmer