Sunrise Mesa to-do list

From RAWiki
Revision as of 14:22, 22 December 2020 by EmmaAlex (Talk | contribs) (Immediate Action Items)

Jump to: navigation, search

Sunrise Mesa Community Task List

Immediate Action Items

  • Mask remainder of Mobile Home for painting (Richard & Blanka)
  • Renovate Poultry Shed (Dustin) prep for introducing birds (Pigeons and chickens)
    • Beef up structure
    • Seal Perimeter
  • Paint Two Bedrooms and the Bathroom of the Mobile Home - Zach Chupa
  • Connect 220v electrical panel of Tiny house and remove the extension cords
  • trench for water
  • connect tank
  • modify well pump connect using pitiless adapter
  • investigate the pressure pump
  • name, list and map all structures, areas, ponds and pasture
  • prepare notes for meeting with John and Lisa Marie Cranmer


18:35, 19 November 2020 (MST)

  • Schedule meeting with Abe - Andre
  • Nov 25, 2020 at 11 meeting with Abe