Sunrise Mesa to-do list
From RAWiki
Sunrise Mesa Community Task List
To-Do
- Mobile Home
- Mask remainder of Mobile Home for painting (Richard & Blanka)
- Paint Two Bedrooms and the Bathroom of the Mobile Home - Zach Chupa
- Replace broken windows
- Prep north-side bedroom and bathroom for resident arrival
- Renovate Poultry Shed (Dustin) prep for introducing birds (Pigeons and chickens)
Beef up structure- Seal Perimeter
- Paint Shed
- Setup interior
- Tiny House
Connect 220v electrical panel of Tiny house and remove the extension cordsfix water heaterRepair tiny house water system
- Root Cellar Task List
- Clean out
- Water System
- trench for water
- connect tank
- modify well pump connect using pitiless adapter
- investigate the pressure pump
- Property Cleanup
move and sort scrap wood, metal, and tires from drivewaytear down green shedcreate salvageable wood pile(located in red stables)- move and sort scrap wood, metal, and tires from front fields
- remove unnecessary fencing from front field
- tear down front red shed siding
- Property Planning
- Name, list and map all structures, areas, ponds and pasture
- Create map of "dream scenario" for the property
- Prepare notes for meeting with John and Lisa Marie Cranmer