Sunrise Mesa to-do list

From RAWiki
Revision as of 17:16, 2 February 2021 by Hadassah (Talk | contribs) (Workday Feb 13, 2021)

Jump to: navigation, search

Sunrise Mesa Community Task List

To-Do

Workday Feb 13, 2021

  • Lift roof on Loafing Shed
    • Leader: Ried Lustig
  • Red Barn South Wall rebuild
    • Leader: Andre
  • Red Barn Cleanout
    • Hadassah
  • Mobile Home Kitchen Painting/Cleaning
    • Chelsey
  • Tree Trimming

General To Do

  • Mobile Home

**Mask remainder of Mobile Home for painting (Richard & Blanka) **Paint Two Bedrooms and the Bathroom of the Mobile Home - Zach Chupa

    • Replace broken windows
    • Prep north-side bedroom and bathroom for resident arrival
  • Renovate Poultry Shed (Dustin) prep for introducing birds (Pigeons and chickens)
    • Beef up structure
    • Seal Perimeter
    • Paint Shed
    • Setup interior
  • Tiny House
    • Connect 220v electrical panel of Tiny house and remove the extension cords
    • fix water heater
    • Repair tiny house water system
  • Root Cellar Task List

**Clean out

  • Water System
    • trench for water
    • connect tank
    • modify well pump connect using pitiless adapter
    • investigate the pressure pump
  • Property Cleanup
    • move and sort scrap wood, metal, and tires from driveway
    • tear down green shed
    • create salvageable wood pile (located in red stables)
    • move and sort scrap wood, metal, and tires from front fields
    • remove unnecessary fencing from front field
    • tear down front red shed siding
  • Property Planning
    • Name, list and map all structures, areas, ponds and pasture
    • Create map of "dream scenario" for the property
  • Prepare notes for meeting with John and Lisa Marie Cranmer