Sunrise Mesa Infrastructure Tasks

From RAWiki
Revision as of 18:46, 24 November 2020 by KateN (Talk | contribs)

Jump to: navigation, search

Form a strategy and delegate tasks to Sunrise Mesa team members

  • Chelsey Sweet
  • Kate Newburgh
  • Andre Houssney
  • Richard & Blanka
  • Alex Beal
  • Dustin Biondi
  • Ried Lustig
  • Abe Lentner
  • Jordan Cummings

People to Ask

  • Ried and Kelsey Morgan
  • Define roles and responsibilities for each with goals
  • Categorize tasks as Urgent vs Important, create goals and timeline

Immediate Action Items

  • Mask remainder of Mobile Home for painting (Richard & Blanka)
  • Renovate Poultry Shed (Dustin) prep for introducing birds
  • Paint Two Bedrooms and the Bathroom of the Mobile Home - Zach Chupa
  • Connect 220v electrical panel of Tiny house and remove the extension cords
  • trench for water
  • connect tank
  • modify well pump connect using pitiless adapter
  • investigate the pressure pump
  • name, list and map all structures, areas, ponds and pasture
  • prepare notes for meeting with John and Lisa Marie Cranmer

Horse Barn (White)

  • Source sheet metal (standing seam)
  • Investigate structural members and plan sistering
  • Investigate Foundation

Red Barn (Red)

  • Investigate foundation and plan new footing
  • Investigate structural members and plan sistering
  • Create plant for roof

Beekeeping

  • assess hives
  • treat for mites
  • winterize
  • secure against bears

Pastures, Fields and Outdoor Areas

  • Sunrise Mesa Prairie Dog Plan: create
  • Spread Manure, lots
  • Map water and plan ditches
  • Fencing Plan
  • Ponds and Streambed Rebuild
  • Soil Prep for planting in Spring